Al Busttan supplied specialized personnel and equipment necessary for the construction of the Al Khorayef Petroleum Company operational base in NR. Our contributions included supplying and installing mobile portable cabins used for accommodation, offices, bathrooms, and recreation areas. The camp features 47 mobile caravans with the capacity to accommodate approximately 100 persons. Additionally, we constructed steel prefab workshops and installed diesel generator sets complete with sheds and accessories, ensuring a fully functional and comprehensive operational setup.
Generators and VSD Systems installation and piping works in Zubair Oil Field
Al Busttan scope included Civil works of 50 wellheads which comprised of area preparation, supply and pouring of 4000 m3 of concrete for pipe supports, mechanical equipments, E & I instruments and CCR foundations, Supply fabrication and installation of 80 tons of steel structure , piping installation for flow lines & interconnecting piping , surface preparation loop testing of E & I cables.