Pipelines Installation in WQ2

Al Busttan completed a pipeline installation contract in WQ2, which concluded in 2017. The project involved approximately 25,000 engineering man-hours and 360,000 site man-hours. Our work included the construction and pre-commissioning of an API5L trunk line for crude oil, measuring 18 inches in diameter, and an 8-inch flow line.

Client:

EID INSAAT Turkish Company

Categories:

Construction

Date:

2017

Additionally, our team handled civil works such as constructing equipment foundations, drain channels, and pits. We also managed the installation of key components, including dosing packages and electrical equipment, contributing to the successful completion and operation of the infrastructure.

Our Construction Department consists of a highly experienced team of Civil Engineers, skilled craftsmen, and bricklayers, who possess the ability to undertake tasks on short notice. The department boasts its own comprehensive fleet of equipment, including Vibrating Rollers and Graders, JCB Backhoes, Articulated Tipper Trucks with capacities ranging from 30 to 60 tons, Front-Wheel Loaders, Mercedes Benz-made Low Loaders, Concrete Mixer Trucks, 60,000-liter Water Tankers, and Bulldozers for fresh land preparation. Additionally, we have various cranes and Scissor Lifts to support diverse construction needs. This extensive array of equipment enables us to deliver high-quality construction services efficiently.