Baker Hughes NR Camp Construction Contract - 2009

Our company was tasked with the land preparation and civil works necessary to construct the 100,000m² operational bases for Baker Hughes in North Rumaila. Our responsibilities extended to the design and fabrication of the main workshop, measuring 2100m², as well as the construction of the main access road. Additionally, we were involved in the delivery and installation of 72 prefabricated cabins and accommodation units, each fully equipped with furniture, toilets, beds, air conditioning, septic tanks, water tank piping, and generators. Furthermore, we committed to maintaining and operating these facilities for a period of 12 months, ensuring full functionality and comfort for the personnel stationed there.

Client:

Baker Hughes Company

Categories:

Construction

Date:

Since 2009

Baker Hughes Provision Of Engineering, Procurement, Construction And Completion (EPC) Of Early Civil Works – Zubair Oil Field - 2012 To 2015

The scope of work for our company included early civil works necessary for the development of 21 well pads and several other areas, along with constructing 4.5 km of asphalt road. These activities involved pouring 16,000 m³ of concrete, 12,000 m³ of excavation, and managing hundreds of thousands of cubic meters of soil backfilling. We also supplied and installed approximately 2.5 km of T-Wall and performed necessary earthing operations, among other tasks. These efforts laid the foundational groundwork for further development and ensured the structural integrity and safety of the site.

Baker Hughes Rig Camps Movement Contract - WQ1 2013

Our company provided specialized machineries, personnel and equipment requested to carry out work activities for Baker Hughes rig camps movements in  Zubair Oil Feilds.